Our company undertook and successfully executed the hydrodemolition works.
30 cc of concrete on the interconnecting gallery vault of Driskos tunnel at the intersection point connecting it to the exhaust fumes ventilation.
For this project, our company used the automated water jet system WOMA 700Z with a capacity of 1350 Bar, 200 lit/min, 650Hp.
The total duration of the project along with the installation of the equipment was 15 days.