Portfolio Category: Έργα

ELPE / EKME – Aspropyrgos Refineries

ELPE / EKME – Aspropyrgos Refineries «FCC Κ4101-Υ Reactor Hydrocutting » Our company undertook and successfully executed at the time of the Shut Down at the Aspropyrgos Refinery (April 2015 – June 2015) the cutting of the FCC Κ4101-Υ Reactor using the hydrocutting method. The total thickness cut was 125mm, 25mm of which was metal…
Read More

ELPE – Aspropyrgos Refinery – General Shut Down 2015

ELPE – Aspropyrgos Refinery – General Shut Down 2015 Our company undertook and successfully executed at the time of the Shut Down at the Aspropyrgos Refinery (April 2015 – June 2015) the following projects: Hydrodynamic cleaning (inside – outside) of 270 exchangers (total yards: 150.380) Hydrodynamic cleaning (inside) of 65 air coolers Hydrodynamic cleaning (inside)…
Read More

MOTOR OIL

Oil tank blasting and painting Our company undertook and successfully executed the project of blasting and painting of an 80m-diameter and 18m-high oil tank, with a total surface of 4.521 m2. (more…)
Read More

EGNATIA ODOS

Hydrodemolition works in exhaust fumes ventilation system in Driskos tunnel Our company undertook and successfully executed the hydrodemolition works. (more…)
Read More