«FCC Κ4101-Υ Reactor Hydrocutting »
Our company undertook and successfully executed at the time of the Shut Down at the Aspropyrgos Refinery (April 2015 – June 2015) the cutting of the FCC Κ4101-Υ Reactor using the hydrocutting method. The total thickness cut was 125mm, 25mm of which was metal and 100mm refractory coating.
